裝配步驟 |
The assembly instructions of the thread insertIt consists of drilling、tapping、bottom detect、installation of thread insert and break-offtool,
mainly, thread detect、the six assembly instructions follows:
1、Drilling:
The taper should be selected suitably from the dimension of do in the table and be sharpened accurately The chamfer is inappropriate to exceed t he depth of 0.4p after tapping. the best chamfer is 120°, which makes against setting of thread insert if it is too big.
2、Tapping:
The special screw tap corresponding to the thread insert is selected to use (using lubricant oil or grease for this operation) when the through
hole is tapped, the force should be appropriate to prevent taper rupturing. After tapping the tape hole should be cleared.
3、Bottom detect:
Clean up bottom clastic after tapping, detected the pass and stop instrumeat of bottom by bottom plug before theinstallation.
4、Installation of thread insert:
Insert the tool in the dilled hole lower than thethread insert into the tapping pressure.
5、Break-offtool:
Break the tail off using the break-off tool in order to use the whole length of the tapping
6、Thread detect:
After installing the screw sets, detected the pass and stop instrument by thread plug guge.
7: a screw, steel wire during the installation process problems, or because the wire use time is too long a screw wire can be removed,
should be used with a blade sleeve tool on the port, a screw with a hammer blow, with the hand to press the handle to the thread tension
spinning can exit steel wire spiral sets.
大連安迪機(jī)械設(shè)備有限公司
緊固件部
電話:0411-86858458 Tel:+86-411-86858458
傳真:0411-86859989 Fax:+86-411-86859989
網(wǎng)址:http://ynodngn.cn E-Mail:dlandi@dlandi.com
地址:遼寧省大連市甘井子區(qū)虹彩西園103號(hào)
機(jī)械部
電話:0411-86408898 Tel:+86-411-86408898
傳真:0411-86858239 Fax:+86-411-86858239
技術(shù)支持:愛(ài)得科技遼ICP備12016963號(hào)-1